Sing T.

Data Entry Specialist & Backend Operations Support

About Me

I hold a Bachelor's degree in Electronic Engineering, which has trained me to be highly meticulous, analytical, and extremely accurate with data. Whether you need simple, repetitive data entry done with 100% precision, or complex spreadsheet automation, I can handle it.

Languages: Native in Indonesian, Active in Mandarin Chinese, and proficient in written English for data processing and text communication.

General Data Entry Google Sheets / Excel Data Logic & Accuracy Indonesian (Native) Mandarin (Active) English (Written)

What I Can Do For You

General Data Entry & Admin

Ready to handle repetitive tasks, copy-paste operations, web research, and database population. My engineering background guarantees that your data will be 100% accurate and strictly formatted.

E-Commerce & Tech Localization

Translating and formatting product catalogs, technical specifications, and supplier data from Mandarin/English into Indonesian for local e-commerce markets.

Spreadsheet Automation

Turning messy data into organized Google Sheets/Excel. I build automated tracking systems, logic flows, and data entry forms using AppSheet.

Systems & Data Projects

Click any image to view and zoom in full screen

1. Maritime Document Tracking System

Problem: Clients struggled to manage ship certificates. Expired documents severely disrupt ship operations, preventing ships from sailing as port clearance cannot be issued.

Action: I built a document tracking system using Google Sheets for data entry. The system sends automated email reminders when an expiry date approaches. Clients monitor real-time expiry dates through a web dashboard I created.

Result: Clients can easily track renewal timelines and prepare budget allocations in advance, ensuring uninterrupted ship operations.

Dashboard 1
Dashboard 2
Sheets Data
Email Alert

2. RS485 Modbus Data Logger

Problem: The client needed to monitor the real power consumption of each electrical device in their factory to calculate actual power requirements.

Action: I developed an RS485 Modbus data logger to monitor machine power consumption. Data is exported to a CSV file for further analysis using Excel.

Result: By identifying the peak load, the client precisely adjusted their electrical power allocation, eliminating the risk of MCB tripping due to power overload.

Screenshot 1
Screenshot 2

3. Daily Electrical Power Consumption Logger

Problem: The client needed a way to track daily electrical power consumption to accurately forecast monthly usage and budget.

Action: I developed a data logging application using AppSheet integrated with Google Sheets. The client inputs daily kWh meter readings into the app, which automatically updates the database for date-based tracking.

Result: The client can now monitor daily consumption, compare daytime versus nighttime usage, and accurately estimate their monthly electrical expenses.

AppSheet UI
Google Sheets Log

4. IoT Driver Attendance System

Problem: The client needed to monitor drivers' clock-in/out times for payroll and overtime calculations.

Action: I created a system using an ESP32 module connected to an NTP server to display a time-synchronized QR code. Drivers scan it with their phones. The timestamp data routes directly into Google Sheets.

Result: Payroll and overtime are calculated automatically directly from the worksheet, eliminating manual calculation errors.

Screenshot 1
Screenshot 2
Screenshot 3

5. Digital Guest Book Tracker

Problem: The client frequently received office guests and needed an efficient way to track when specific visitors last arrived and how long they stayed, as manual logbooks were difficult to search.

Action: I built a digital guest book tracking system utilizing AppSheet and Google Sheets to log all visitor data digitally.

Result: The client can now instantly search the database to retrieve the exact date, arrival time, and departure time of any past guest.

Screenshot 1
Screenshot 2

6. Kids Medical History Application

Problem: The client needed a systematic way to track their child's medical history (visit dates, illnesses, medications) to provide accurate information to doctors during follow-up consultations.

Action: I developed an application connected to Google Sheets to log doctor visits. The app includes features to record consultations and attach photos of medical prescriptions and lab test results.

Result: The client can quickly search for previous symptoms and detailed medical history to show to their physician, enabling much faster and more accurate diagnoses.

Screenshot 1
Screenshot 2

Technical Documentation & Planning

7. Standard Operating Procedure (SOP) for Marine AIS

Authored a comprehensive Standard Operating Procedure for the usage of the Automatic Identification System (AIS) on ships, ensuring crew compliance and operational safety.

SOP Extract

8. Ship Engine Overhaul Timelines

Created detailed timelines and scheduling documents to manage complex overhaul processes efficiently. I have converted these schedules into interactive web-based Gantt charts.

(Select a timeline below to view the interactive schedule).

Timeline Chart Thumbnail
General Overhaul 2M Crankshaft Replacement Top Overhaul AE 3M